To study and reduce the periodic inspection time of Mushshak A/C Muiz-Ud-Din Shami CAEG-53 (A)

By: Zafar AliPublisher: Risalpur NUST 2001Edition: 1stDescription: 63pDDC classification: PR 504
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Collection Call number Status Date due Barcode Item holds
Book Book College of Aeronautical Engineering (CAE)
College of Aeronautical Engineering (CAE)
NFIC PR 504 (Browse shelf) Available CAEPR-504
Total holds: 0

BE Project Reports

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.