Causes of cost and time over run in the construction project of Pakistan Shahbaz Butt

By: Shahbaz ButtContributor(s): Shahbaz ButtMaterial type: TextTextPublisher: MCE 2006Description: 112 pSubject(s): ProjectDDC classification: P-322
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Call number URL Status Notes Date due Barcode Item holds
Book Book Military College of Engineering (MCE)
Military College of Engineering (MCE)
P-322 (Browse shelf) Link to resource Available Project MCE-P-322
Total holds: 0

0 0 0 P_322

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.