00717 a2200169 4500003000500000005001700005040000900022082001600031100003700047245017200084260003900256300001100295505018200306650001500488651001000503700003400513NUST20251110133154.0 cNust a621.382,ALA aAlam, PC Mehtab Muhammad (TCC-3) aTo study the feasibility and to install an ethernet network /cPC Muhammad Mehtab Alam, SGT Abdul Tawab Nagi, CQMS Waseem Ahmed Qureshi and PC Mazhar Mehmood. (TCC-03) aRawalpindibMCS (UET Lahore)c1995 a53 p.; rIntroduction (Page-1), Overview (Page-8), Architecture (Page-45), Ethernet networks (Page-52), Network design (Page-72), NW Mangement (Page-78), NW Operating systems (Page-83).  aUG Project aTCC-3 aSupervised by Dr. Aftab Ahmed