Your search returned 2 results.

Not what you expected? Check for suggestions
Causes of Cost and Time Overrun in the Construction Projects of Pakistan

by Shahbaz Butt | Ahsan Raza.

Material type: Text Text Publisher: Risalpur Cantt MCE Availability: Items available for loan: Military College of Engineering (MCE) Call number: P-321 (1).
Causes of cost and time over run in the construction project of Pakistan Shahbaz Butt

by Shahbaz Butt | Shahbaz Butt.

Material type: Text Text Publisher: MCE 2006Availability: Items available for loan: Military College of Engineering (MCE) Call number: P-322 (1).
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.