FEASIBILITY STUDY FOR IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) ON PROPULSION SYSTEM OF F-22P SHIP / Taneer Anjum Bhatti.
Material type:
TextPublisher: Islamabad : PNEC - NUST, 2011Description: x, Var. p. : ill. ; 30cmSubject(s): Industrial Mechanical Engineering MS-ThesisDDC classification: 670.5
| Item type | Current location | Home library | Shelving location | Call number | Status | Date due | Barcode | Item holds |
|---|---|---|---|---|---|---|---|---|
Thesis
|
Central Library (CL) | Central Library (CL) | Thesis | 670.5 (Browse shelf) | Available | CL-T-6097 |
Total holds: 0

Thesis
There are no comments on this title.