| 000 | 00561nam a22001577a 4500 | ||
|---|---|---|---|
| 999 |
_c534760 _d534760 |
||
| 020 | _qHard Cover. | ||
| 082 | _a629.04 | ||
| 100 | _aKaleem, Sidra | ||
| 245 |
_aEstimation of highway project duration at the planning stage and analysis of risk factors leading to time overrun / _cSidra Kaleem. |
||
| 260 |
_aIslamabad: _bSCEE - NUST, _c2014. |
||
| 300 |
_a626 p. : _bill. ; _c30cm. |
||
| 942 |
_2ddc _cTHE |
||
| 650 |
_aTransportation Engineering MS-Thesis. _916276 |
||
| 700 |
_aDr. Muhammad Irfan _917128 |
||