| 000 | 01906cam a2200313 i 4500 | ||
|---|---|---|---|
| 001 | 19939995 | ||
| 005 | 20240829134526.0 | ||
| 008 | 170822s2019 nyu b 001 0 eng | ||
| 010 | _a 2017039940 | ||
| 020 | _a9781292264905 | ||
| 040 |
_aDLC _beng _cDLC _erda _dDLC |
||
| 042 | _apcc | ||
| 050 | 0 | 0 |
_aTA177.4 _b.S85 2019 |
| 082 | 0 | 0 |
_a658.15,SUL _223 |
| 100 | 1 |
_aSullivan, William G., _d1942- _eauthor. |
|
| 245 | 1 | 0 |
_aEngineering economy / _cWilliam G. Sullivan, Virginia Polytechnic Institute and State University, Elin M. Wicks, Abacus Accounting, LLC, C. Patrick Koelling, Virginia Polytechnic Institute and State University. |
| 250 | _aSeventeenth edition. | ||
| 264 | 1 |
_aNY, NY : _bPearson, _c[2019] |
|
| 300 |
_axxiv, 716 pages ; _c24 cm |
||
| 336 |
_atext _btxt _2rdacontent |
||
| 337 |
_aunmediated _bn _2rdamedia |
||
| 338 |
_avolume _bnc _2rdacarrier |
||
| 505 | _aChapter 1: Introduction to Engineering Economy (Page-31), Chapter 2: Cost Concepts and Design Economics (Page-50),Chapter 3: Cost-Estimation Techniques (Page-92),Chapter 4: The Time Value of Money (Page-134), Chapter 5: Evaluating A Single Project (Page-218),Chapter 6: Comparison and Selection Among Alternatives (Page-276),Chapter 7: Depreciation and Income Taxes (Page-352), Chapter 8: Price Changes and Exchange Rates (Page-415),Chapter 9: Replacement Analysis (Page-452),Chapter 10: Evaluating Projects with the Benefit−Cost Ratio Method (Page-493),Chapter 11: Breakeven and Sensitivity Analysis (Page-525),Chapter 12: Probabilistic Risk Analysis (Page-553),Chapter 13: The Capital Budgeting Process (Page-597),Chapter 14: Decision Making Considering Multiattributes (Page-626). | ||
| 650 | 0 | _aEngineering economy. | |
| 700 | 1 |
_aWicks, Elin M., _eauthor. _9125511 |
|
| 700 | 1 |
_aKoelling, C. Patrick, _d1953- _eauthor. _9125512 |
|
| 906 |
_a7 _bcbc _corignew _d1 _eecip _f20 _gy-gencatlg |
||
| 942 |
_2ddc _cBK _k658.15,SUL |
||
| 999 |
_c611248 _d611248 |
||